Skip to content

In the East River, Verdant Power Sleeps With the Fishes

One of Verdant Power's tidal turbines prior to installation in the East River.



One of Verdant Power’s tidal turbines prior to installation in the East River.

Apparently, you have to read British newspapers to catch news about innovative environmental developments in New York City. The Guardian looks at Verdant Power, a small company that is working with the State to develop hydro-electric power right here in the East River.

The state is teaming up with a Virginia company to use the East River for a unique experiment in renewable energy: Six giant turbines are being placed underwater in a $7 million project to harness the energy of the tides and produce electricity. One of the 16-foot-diameter, windmill-like turbines is already operating, supplying power to a grocery store and a garage on Roosevelt Island. The other turbines are being installed over the next two weeks.

Hydroelectric and wind power operate on similar principles, with water or air turning turbines. But those projects require dams or windmills, which can be costly, intrusive and objectionable to environmentalists.

Project organizers say this is the first time the underwater-turbine concept has been used in the U.S.

Beth Fertig also did a story as part of WNYC’s Feeling the Heat series, a couple of weeks ago. 

Photo of Jason Varone
Jason Varone battles the streets everyday during a 9 mile commute on his bicycle from downtown Brooklyn to the Upper East Side. In addition to his efforts on Streetsblog, he is an artist making work related to the environment and technology. Examples of his work can be found at www.varonearts.org.

Read More:

Streetsblog has migrated to a new comment system. New commenters can register directly in the comments section of any article. Returning commenters: your previous comments and display name have been preserved, but you'll need to reclaim your account by clicking "Forgot your password?" on the sign-in form, entering your email, and following the verification link to set a new password — this is required because passwords could not be carried over during the migration. For questions, contact tips@streetsblog.org.

More from Streetsblog USA

Urban Truth Collective: The One-Hour City Conspiracy

April 27, 2026

Monday’s Headlines Introduce the New Green New Deal

April 27, 2026

How Intercity Bus Lines Are Rebranding To Attract New Riders

April 27, 2026

Train Tubers: a Talk with the YouTube’s Transit Warriors

April 24, 2026

New E-Mobility Study Actually Reveals Need For Safer Streets, Not E-Bike Crackdowns

April 24, 2026
See all posts