Skip to Content
Streetsblog USA home
Streetsblog USA home
Log In
Rail systems like BART and WMATA -- that were built in the 70s and 80s -- are beginning to show their age. Chart via <a href=
Rail systems built 40 years ago like BART and DC Metro have serious maintenance needs. Click to enlarge. Chart via Christof Spieler/Twitter

What should we make of the recent headline-grabbing service disruptions at Washington Metro and BART? This chart from Houston transit advocate Christof Spieler offers some important perspective.

These transit systems are reaching the age where maintenance needs are increasingly urgent. Alex Block at City Block writes:

BART, the snake digesting the mouse: Until seeing the data presented this way, I never appreciated how much of the BART system (navy blue on the chart) was built in quick succession in the early 1970s. The system didn’t add any route miles until the first phases of the San Mateo-SFO Airport extension came online starting in 1995. Contrast that to the history of WMATA (gray bars on the chart) regularly opening smaller system segments over a span of 20 years. MARTA also expanded by adding segments over the course of two decades.

The implication for maintenance is that BART is kinda like a snake digesting a meal -- the bulge of maintenance needs/life cycle costs now coming due. WMATA has a similar length of track to maintain, but won’t have to deal with such a large portion of the system reaching mid-life at the same time.

Block points out that the chart also highlights the shrinking federal support for grade-separated urban rail systems:

End of Federal (Capital) Role: It’s hard to overlook the long-term trend as well -- cities aren’t opening new third-rail, fully grade-separated transit systems anymore. There are only seven of these systems, most of which received substantial capital funding from the predecessor to the Federal Transit Administration, the Urban Mass Transit Administration; and there have only been a handful of expansions of these systems (absent federal funding) since 2004. Of those recent expansions, two are airport connectors (Miami and Oakland – and the other is WMATA’s first phase of the Silver Line, eventually destined to reach Dulles International Airport).

Limited federal funding, rising costs, and limited flexibility of fully grade-separated systems meant that capital spending shifted away from subways and towards light rail systems.  Even high capacity transit projects (such as Seattle’s light rail system) with substantial grade separation have opted for the flexibility of a light rail platform. Subway system expansion in the US is limited to regions locked into that technology.

Elsewhere on the Network today: Transport Providence makes the case for replacing the 6/10 Connector with a surface boulevard instead of an underground highway. Tim Kovach says a parking tax could be a smart answer to Cleveland's transit funding crisis. And Mobilizing the Region points out a glaring flaw in how the Federal Highway Administration markets its National Household Travel Survey.

Stay in touch

Sign up for our free newsletter

More from Streetsblog USA

Mayor Bowser Blasts U.S. DOT Talk of Eliminating Enforcement Cameras in DC

The federal Department of Transportation is exploring how to dismantle the 26-year-old enforcement camera system in Washington, D.C.

January 8, 2026

Thursday’s Headlines Are Making Progress

By Yonah Freemark's count, 19 North American transit projects opened last year, with another 19 coming in 2026.

January 8, 2026

The ‘Affordability Crisis’ Conversation Can’t Leave Out the Cost of Cars

We can't talk about Americans' empty wallets without talking about our empty buses and sidewalks.

January 7, 2026

Opinion: E-Bikes Are An Economic Boost That Cities Must Seize

E-bikes and scooters are reshaping local retail markets by expanding who can reach neighborhood businesses with frequency, ease, and convenience.

January 7, 2026

Wednesday’s Headlines Have Seen the Light

One year later, data shows congestion pricing in New York City has been an unqualified success.

January 7, 2026

How New York’s Governor Learned to Stop Worrying and Love Congestion Pricing

She loved, then hated, then loved, then gutted, and, yesterday, celebrated the congestion pricing toll as it marked its first birthday.

January 6, 2026
See all posts