Skip to Content
Streetsblog USA home
Streetsblog USA home
Log In
Columbus

The Columbus Bus Network Redesign Boosted Ridership

Frequent service maps (15 minute headways or greater) for Columbus’ COTA before (left) and after (right) the system redesign. Maps: Columbus Underground

One year after the rollout of Columbus, Ohio's completely overhauled bus system, ridership is up -- a sign that the redesign is working as planned.

May 2018 ridership was 1.6 percent higher than in May 2017, when the overhaul took effect. Ridership was 3.6 percent higher in June 2018 than in June 2017.

The redesign was the first time the entire system had been systematically rethought in 40 years. Every bus route was reconsidered and reworked to emphasize frequent service in high-ridership areas and make the system easier to navigate and use.

System redesigns can be difficult politically, with riders objecting to route changes. And COTA did deal with lots of rider complaints at the outset. But Patrick Harris, COTA's director of government affairs, says the new numbers help confirm that the effort was worth it.

"I think the ridership numbers speak to the fact that riders have enjoyed the new service," he told Streetsblog.

More impressive, the ridership increases for COTA come at a time when many other transit agencies, even agencies that have made big investments in rail infrastructure, have seen ridership decline.

The overhauled Columbus system was designed to improve headways and weekend service -- giving riders more flexibility to move around on their own schedules. Sunday ridership is up 24 percent and Saturday ridership is up 6 percent, Harris said. Weekend service was expanded dramatically. Balancing service hours over the week better accommodates changing work schedules, especially for workers with lower incomes.

Prior to the redesign, COTA executives told Columbus Underground the system had just four routes that offered service every 15 minutes or better. Those routes made up 40 percent of the system's ridership. The number of high-frequency routes was roughly doubled by the overhaul.

COTA hoped the redesign would increase ridership 10 percent over three years. One year in it appears the agency is on track.

Stay in touch

Sign up for our free newsletter

More from Streetsblog USA

Friday’s Headlines Drink From the Firehose

A key DOT nominee's role in Project 2025, more dubious executive orders, climate change accelerates and more headlines.

February 7, 2025

Friday Video: It’s Been a Week! Take A Breath And Watch People Bike In Utrecht

Take a break, regulate yourself, and get back to fighting for a better future for transportation in America.

February 7, 2025

Commentary: It’s Time for Newsom to Bring it Home on High Speed Rail

Oil-funded, Trumpian Republicans long-ago decided to turn California's HSR project into a political football. If they want to play games, then it's long past time for California Democrats to stop jerking around and play to win.

February 6, 2025

Talking Headway Podcast: 20 is Plenty in Wales

Welsh MP Lee Waters and the University of Sydney's Dr. Jennifer Kent on how Wales passed a national 20 mph speed limit.

February 6, 2025

Who is Trump’s FTA Pick Marc Molinaro — And Will He Kill Congestion Pricing?

If confirmed, Trump FTA pick Marc Molinaro can do a lot to gum up funding for mass transit across the country. Here's a look at his record.

February 6, 2025
See all posts